M3.8: MCP server lutra mcp

- crates/mcp (L5): JSON-RPC 2.0 over stdio, dual era: MCP 2026-07-28
  (per-request _meta, server/discover, -32022) and legacy initialize
  (2025-11-25, 2025-06-18, 2025-03-26, 2024-11-05). Tools list_commands,
  execute_command (app.quit only with confirm: true), screenshot (image
  content), read_buffer, get_events (ring of 1000 events via
  events.subscribe); resources lutra://buffer/<path> for open buffers.
  Engine errors become tool errors with the engine code. Lines capped at
  16 MiB, guard around every request, parser and tool args fuzzed.
- lutra mcp [--port PORT] [--no-start] in apps/lutra-cli: connects through
  the rendezvous file and token, or starts Lutra.
- Engine: read-only buffer.list command.
- Tests: protocol units + proptest fuzz, integration over the token
  listener, stdio end to end. Docs: architecture (MCP), G7, ROADMAP.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
danny 2026-10-19 18:20:57 +02:00
parent 51eba0b3cb
commit 0e56c22b66
24 changed files with 3055 additions and 18 deletions

View file

@ -1,6 +1,6 @@
# Gaps
> **Status:** M0 closed G1; G2 under way (text buffer, engine buffers, tabs and editor in the app, recovery journal); G3 M1 part done (project tree, palette, settings dialog, themes) plus the app menu (M3.9); G4 under way (tree-sitter outline and folding library, Lezer highlighting, Structure tool window); G5 under way (search backend, Find tool window, symbol index, go-to popup); G6 under way (LSP client library, PHP detection, Phpactor download); G7 under way (`lutra` CLI and single instance); G14 English UI catalog in place · **Last updated:** 2026-10-19
> **Status:** M0 closed G1; G2 under way (text buffer, engine buffers, tabs and editor in the app, recovery journal); G3 M1 part done (project tree, palette, settings dialog, themes) plus the app menu (M3.9); G4 under way (tree-sitter outline and folding library, Lezer highlighting, Structure tool window); G5 under way (search backend, Find tool window, symbol index, go-to popup); G6 under way (LSP client library, PHP detection, Phpactor download); G7 under way (`lutra` CLI and single instance, MCP server); G14 English UI catalog in place · **Last updated:** 2026-10-19
Every known shortfall, ranked. This is the work list: unless the owner gives a task, take the highest open gap. Hours are agent wall-clock hours for one agent, all estimated.
@ -12,7 +12,7 @@ Every known shortfall, ranked. This is the work list: unless the owner gives a t
| G4 | Syntax and structure: tree-sitter PHP, ~~Lezer highlighting~~ (M2.2: PHP with embedded HTML plus HTML, CSS, JS/TS, JSON, YAML, Markdown; `--lt-syntax-*` tokens; `editor.reveal`), ~~file structure~~ (M2.7: Structure tool window, `syntax.outline`), semantic highlighting, folding in the editor | M2 | ~8 h |
| G5 | Search and navigation: find in files, go to file/class/symbol, first index | M2 | ~35 h |
| G6 | Language server: completion, diagnostics, definition, hover, rename via Phpactor (~~PHP detection and Phpactor download~~, M3.1) | M3 | ~43 h |
| G7 | Terminal, ~~`lutra` CLI and single instance~~ (M3.7: open folders and files at a line, `--wait`, forwarding a second start, token-protected rendezvous), MCP server, files outside the open project (the CLI refuses them; needs out-of-project buffers or a second window), `lutra diff` | M3 | ~30 h |
| G7 | Terminal, ~~`lutra` CLI and single instance~~ (M3.7: open folders and files at a line, `--wait`, forwarding a second start, token-protected rendezvous), ~~MCP server~~ (M3.8: `lutra mcp` with list/execute every command, screenshot, read buffer, recent events, open buffers as resources; still missing: resource and tool change notifications, progress for long commands), files outside the open project (the CLI refuses them; needs out-of-project buffers or a second window), `lutra diff` | M3 | ~26 h |
| G8 | Git integration | M4 | ~150 h |
| G9 | Debugger, test runner, Composer, run configurations | M5 | ~300 h |
| G10 | Own indexer, type inference, inspections, refactorings | M6 | ~800 h |
@ -50,6 +50,7 @@ G6 progress: M3.2 landed the LSP client library in `crates/lsp`: JSON-RPC framin
| Date | Change | Summary |
|---|---|---|
| 2026-10-19 | minor | G7: MCP server (M3.8) |
| 2026-10-19 | minor | G3: app menu (M3.9) |
| 2026-10-18 | minor | G6: PHP detection and pinned Phpactor download (M3.1) |
| 2026-10-18 | minor | G6: LSP client library (M3.2) |