M4.1: Git backend through the installed git
New crate lutra-vcs (L3): a safe git runner (argument arrays, no prompts, GIT_OPTIONAL_LOCKS=0 for reads, timeouts 30 s / 120 s for hooks, output caps, one spawn function for H1's kill-on-close helper), porcelain v2 / -z parsers (property-tested), Repo operations (status, stage, unstage before the first commit, commit and amend, show at HEAD/index, branches, checkout with remote tracking, branch creation checked by check-ref-format) and a .git poll (RepoWatch). Engine: git.status, git.stage, git.unstage, git.commit, git.show, git.branches, git.checkout, git.createBranch on pending outcomes, off the engine lock; gitChanged after changes and debounced 300 ms on .git or project changes; setting git.executable (section Git). Tests against real temp repositories, engine tests through run_waiting, docs (architecture, gaps G8, Git parity row, roadmap M4 row). Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
parent
cd8c34b094
commit
13e7b0aa12
28 changed files with 3485 additions and 9 deletions
|
|
@ -1,6 +1,6 @@
|
|||
# Milestones
|
||||
|
||||
> **Status:** M0 done, M1 done, M2 in progress · **Last updated:** 2026-10-22
|
||||
> **Status:** M0–M3 done, M4 in progress (C5) · **Last updated:** 2026-10-24
|
||||
|
||||
Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, the rest estimated. Since cycle C1 (factor 0.07) M1–M3 were scaled ×0.1 to ×0.15 (measured factors: C1 0.07, C2 0.10, C3 0.14, C4 0.17; next cycle ×0.18); M4–M6 keep their first raw estimates (multiply by ~0.1 for the calibrated value).
|
||||
|
||||
|
|
@ -10,7 +10,7 @@ Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, t
|
|||
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | done 2026-10-16 (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.12 notifications, M1.13 C1 follow-ups, M1.8 command palette and keymap, M1.14 app icon, M1.9b settings dialog; C2 live checks pending, gaming mode) | ~5.6 (measured: C1 2.5, C2 3.1) |
|
||||
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | done 2026-10-17 (C3: M2.1 tree-sitter syntax, M2.2 highlighting + `editor.reveal`, M2.3 search backend, M2.4 Find tool window, M2.5 symbol index + go-to commands, M2.6 go-to popup, M2.7 Structure tool window) | ~6.1 (measured) |
|
||||
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | done 2026-10-22 (C4: M3.1 PHP detection and Phpactor download, M3.2 LSP client, M3.3 engine wiring and diagnostics, M3.4 completion, hover and signature help, M3.5 definition, references and rename, M3.6 integrated terminal, M3.7 CLI and single instance, M3.8 MCP server, M3.9 app menu, M3.10 autosave; live check with real key presses pending) | ~14 (measured) |
|
||||
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | not started | ~150 |
|
||||
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | in progress (C5: M4.1 backend done) | ~148 |
|
||||
| M5 | Debugger (Xdebug via DAP), PHPUnit/Pest runner, Composer, run configurations | not started | ~300 |
|
||||
| M6 | Own indexer and inspections; Symfony, Laravel, Shopware, WordPress support | not started | ~1,100 |
|
||||
| M7 | Workbench and tools: Deployment (FTP/SFTP/local mappings, upload/download, compare with server, save before deploy, optional upload on save per server), Local History, diff tool (files/folders), scratch files, macros, keymap editor, user themes, plug-in system, Database tools and SQL, HTTP Client, SSH/Docker/Vagrant/WSL, File Watchers, external tools, TODO view, tasks and contexts | not started | ~900 |
|
||||
|
|
@ -34,6 +34,7 @@ By the raw estimates the alpha gate needs M1–M4 plus cross-platform verificati
|
|||
|
||||
| Date | Change | Summary |
|
||||
|---|---|---|
|
||||
| 2026-10-24 | minor | M4.1 Git backend; M4 in progress |
|
||||
| 2026-10-22 | minor | C4 review: M3 done (~14 h measured) |
|
||||
| 2026-10-22 | minor | M3.5 definition, references, rename |
|
||||
| 2026-10-22 | minor | M3.4 completion, hover and signature help |
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue