PM: merge M1.12 notifications
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> # Conflicts: # docs/architecture.md # docs/gaps.md # docs/roadmap.md # docs/target-app-parity.md # docs/ui-parity.md
This commit is contained in:
commit
2f8fef876b
21 changed files with 1178 additions and 94 deletions
|
|
@ -7,7 +7,7 @@ Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, t
|
|||
| Milestone | Goal | State | Hours |
|
||||
|---|---|---|---:|
|
||||
| M0 | Foundation: workspace, lints, quality gate, command registry, control channel, empty window | done 2026-10-14 (CI workflow written, not yet run: hosted on Forgejo, runners unknown) | ~2 (measured) |
|
||||
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | in progress (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.13 C1 follow-ups) | ~6 (2.5 measured for M1.1–M1.6) |
|
||||
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | in progress (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.12 notifications, M1.13 C1 follow-ups) | ~6 (2.5 measured for M1.1–M1.6) |
|
||||
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | not started | ~5 |
|
||||
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | not started | ~8 |
|
||||
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | not started | ~150 |
|
||||
|
|
@ -31,6 +31,7 @@ By the raw estimates the alpha gate needs M1–M4 plus cross-platform verificati
|
|||
|
||||
| Date | Change | Summary |
|
||||
|---|---|---|
|
||||
| 2026-10-16 | minor | M1.12 notifications |
|
||||
| 2026-10-16 | minor | M1.13 C1 follow-ups |
|
||||
| 2026-10-16 | minor | M1.7 recovery journal |
|
||||
| 2026-10-16 | minor | M1.9a settings backend, M1.10 themes |
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue