M3.5: go to definition, find references and rename through Phpactor
Engine (`cmd/lsp_nav.rs`, on the pending outcomes of 20d1d28):
- `lsp.definition` (F12) and `lsp.references` (Shift+F12, sorted, with
line previews) return project-relative locations; locations outside
the project, such as PHAR stubs and symlink escapes, are dropped.
- `lsp.prepareRename` uses the word at the cursor when the server has
no prepareProvider.
- `lsp.rename` (F2) applies the workspace edit (`lsp_nav/edit.rs`):
1. Check everything first: inside the project, ranges fit (UTF-16,
CRLF), open buffers unchanged since the request, no file
operations, no incomplete edit.
2. Write closed files atomically through the VFS, restoring earlier
writes when a later one fails.
3. Change open buffers through `buffer.edit` (dirty, undoable).
4. Send each written file to Phpactor as didOpen/didSave/didClose
plus didChangeWatchedFiles; without this its index kept the old
names. Then the summary notification `notification.lsp.renamed`.
UI (`components/editor/nav/`):
- Mod+click goes to the definition, with a pointer cursor while Mod is
held.
- A location picker for several definitions (exclusive modal).
- A References tab in the bottom panel, grouped by file.
- An inline rename field with a use/file count (exclusive modal).
- `BufferSync.beginUndoableRemote` puts the engine's rename edit into
the editor history as one undo step per buffer.
- Catalog strings and tokens only.
Fake LSP server: `--script FILE` with scripted capabilities and
answers (additive next to M3.4's arms).
Tests:
- `crates/engine/tests/lsp_nav.rs` (fake): definition; bad positions;
references; prepareRename; a multi-file rename incl. a closed CRLF
file; refusals for outside the project, a bad range, a stale buffer,
bad names and no server.
- The ignored real-Phpactor test covers definition, references and a
rename and back across 3 files.
- Vitest `ui/tests/nav/`.
Live (Phpactor 2026.06.25.0, Windows, port 7935, tick on):
- definition 93 ms cold / 7-18 ms warm
- references ~140 ms
- prepareRename ~11 ms
- rename 28-59 ms
- index follows written files in 140 ms
- Phpactor 57 MB working set, ~1.6% of a core while ticking idle
Gate: 13 steps, 197 s, Vitest 484 + 1 skipped.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
parent
b3fd7c6478
commit
578160a2ba
28 changed files with 3730 additions and 34 deletions
|
|
@ -64,7 +64,7 @@ claude mcp add lutra -- lutra mcp
|
|||
|
||||
## Status
|
||||
|
||||
**Pre-alpha (2026-10-17): M2 done.** You can open a folder, browse it in the project tree with live updates from disk, and edit and save files in tabs with syntax highlighting for PHP (and HTML, CSS, JS/TS, JSON, YAML, Markdown), with every command in a palette (`Mod+Shift+P`) and settings and the light or dark theme in a settings dialog (`Mod+,`); unsaved text survives a crash and is offered back on the next open; M2 added find in files (`Mod+Alt+F`) and go to file, class or symbol (`Mod+P`, `Mod+Alt+C`, `Mod+T`); M3 has begun with an integrated terminal (`Mod+Shift+T`) and PHP language features from Phpactor: errors underlined as you type (Problems tab `Mod+Alt+P`), code completion, documentation on hover and parameter info; go to definition and rename come next. About 12 agent hours remain to the MVP (M3: language server, terminal, CLI and MCP). [**ROADMAP.md**](ROADMAP.md) has the stage and what's next,
|
||||
**Pre-alpha (2026-10-17): M2 done.** You can open a folder, browse it in the project tree with live updates from disk, and edit and save files in tabs with syntax highlighting for PHP (and HTML, CSS, JS/TS, JSON, YAML, Markdown), with every command in a palette (`Mod+Shift+P`) and settings and the light or dark theme in a settings dialog (`Mod+,`); unsaved text survives a crash and is offered back on the next open; M2 added find in files (`Mod+Alt+F`) and go to file, class or symbol (`Mod+P`, `Mod+Alt+C`, `Mod+T`); M3 has begun with an integrated terminal (`Mod+Shift+T`) and PHP language features from Phpactor: errors underlined as you type (Problems tab `Mod+Alt+P`), code completion, documentation on hover and parameter info, go to definition (`F12` or Ctrl+click), find references (`Shift+F12`) and rename (`F2`). About 12 agent hours remain to the MVP (M3: language server, terminal, CLI and MCP). [**ROADMAP.md**](ROADMAP.md) has the stage and what's next,
|
||||
[`docs/target-app-parity.md`](docs/target-app-parity.md) the parity assessment and [`docs/gaps.md`](docs/gaps.md) the ranked work list.
|
||||
|
||||
**First target (MVP, M1–M3):** open a project, project tree, tabs, editor with highlighting, find in files,
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue