PM: review cycle 1
Some checks are pending
ci / ci (macos-15) (push) Waiting to run
ci / ci (ubuntu-24.04) (push) Waiting to run
ci / ci (windows-2025) (push) Waiting to run

Stage line, feature breadth estimate, M1-M3 hours recalibrated x0.1
after cycle C1 (2.5 h agent time for 37 h estimated).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
danny 2026-10-15 18:38:39 +02:00
parent cea9a0430e
commit 851d438e2a
4 changed files with 21 additions and 18 deletions

View file

@ -2,14 +2,14 @@
> **Status:** M0 done, M1 in progress · **Last updated:** 2026-10-15
Hours are agent wall-clock hours for one agent; M0 is measured, the rest estimated.
Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, the rest estimated. Since cycle C1 (factor 0.07) M1–M3 are scaled ×0.1; M4–M6 keep their first raw estimates (multiply by ~0.1 for the calibrated value).
| Milestone | Goal | State | Hours |
|---|---|---|---:|
| M0 | Foundation: workspace, lints, quality gate, command registry, control channel, empty window | done 2026-10-14 (CI workflow written, not yet run: no remote) | ~2 (measured) |
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | in progress (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor) | ~60 |
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | not started | ~50 |
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | not started | ~80 |
| M0 | Foundation: workspace, lints, quality gate, command registry, control channel, empty window | done 2026-10-14 (CI workflow written, not yet run: hosted on Forgejo, runners unknown) | ~2 (measured) |
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | in progress (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor) | ~6 (2.5 measured for M1.1–M1.6) |
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | not started | ~5 |
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | not started | ~8 |
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | not started | ~150 |
| M5 | Debugger (Xdebug via DAP), PHPUnit/Pest runner, Composer, run configurations | not started | ~300 |
| M6 | Own indexer and inspections; Symfony, Laravel, Shopware, WordPress support | not started | ~1,100 |
@ -25,12 +25,13 @@ Alpha is reached when these six core workflows work end to end on macOS, Windows
5. Commit, diff and switch branches with Git.
6. Drive all of the above from the CLI, the control channel and MCP.
By the estimates above the alpha gate needs M1–M4 plus cross-platform verification, about 350 h.
By the raw estimates the alpha gate needs M1–M4 plus cross-platform verification, about 350 h; calibrated with cycle C1's factor, about 35 h of agent time. Calendar time is dominated by reviews and owner decisions, not agent time.
## Revision history
| Date | Change | Summary |
|---|---|---|
| 2026-10-15 | minor | Cycle C1 review: M1–M3 hours recalibrated ×0.1, M0 CI note |
| 2026-10-15 | minor | M1.6 tabs and editor |
| 2026-10-15 | minor | M1.4 desktop bridge |
| 2026-10-14 | minor | M1 in progress |

View file

@ -35,7 +35,7 @@ Hours are the estimated agent wall-clock hours for one agent to reach behaviour
| Plug-ins | 0.5 | 0% | everything | ~120 (est.) | — |
| AI features | 0.5 | 0% | everything | ~60 (est.) | — |
Sum: about 2,920 h. Adding UI fidelity (~150 h), localization (~40 h), performance (~100 h) and stability hardening (~100 h) gives the ROADMAP's ~3,300 h to full parity. The range is wide (2,000–5,000 h): completion, inspections, refactoring and frameworks depend on an own type-inference engine whose size is hard to judge before M6.
Sum: about 2,920 h. Adding UI fidelity (~150 h), localization (~40 h), performance (~100 h) and stability hardening (~100 h) gives the ROADMAP's ~3,300 h to full parity. These are the raw first estimates. Cycle C1 (M1.1–M1.6) took 2.5 h of agent time for 37 h estimated (factor 0.07), so the calibrated full-parity figure is ~330 h if that speed holds for deeper areas; the ROADMAP shows the range 300–3,300 h until M2/M3 give data for language work. The range is wide (2,000–5,000 h): completion, inspections, refactoring and frameworks depend on an own type-inference engine whose size is hard to judge before M6.
Weights were reviewed at the end of M0 and kept: nothing built so far gives a reason to change them.
@ -61,6 +61,7 @@ The project tree is the first user-visible feature (Project view 8%, estimated);
| Date | Change | Summary |
|---|---|---|
| 2026-10-15 | minor | Calibration note after cycle C1 (factor 0.07) |
| 2026-10-15 | minor | Editor core 0% → 8% (estimated): tabs and editor in the app (M1.6) |
| 2026-10-15 | minor | Project view 0% → 8% (estimated): tree runs against the engine in the app (M1.4) |
| 2026-10-14 | minor | Project view evidence: project tree UI (M1.5), score unchanged |