PM: review cycle 1
Stage line, feature breadth estimate, M1-M3 hours recalibrated x0.1 after cycle C1 (2.5 h agent time for 37 h estimated). Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
parent
cea9a0430e
commit
851d438e2a
4 changed files with 21 additions and 18 deletions
|
|
@ -2,14 +2,14 @@
|
|||
|
||||
> **Status:** M0 done, M1 in progress · **Last updated:** 2026-10-15
|
||||
|
||||
Hours are agent wall-clock hours for one agent; M0 is measured, the rest estimated.
|
||||
Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, the rest estimated. Since cycle C1 (factor 0.07) M1–M3 are scaled ×0.1; M4–M6 keep their first raw estimates (multiply by ~0.1 for the calibrated value).
|
||||
|
||||
| Milestone | Goal | State | Hours |
|
||||
|---|---|---|---:|
|
||||
| M0 | Foundation: workspace, lints, quality gate, command registry, control channel, empty window | done 2026-10-14 (CI workflow written, not yet run: no remote) | ~2 (measured) |
|
||||
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | in progress (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor) | ~60 |
|
||||
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | not started | ~50 |
|
||||
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | not started | ~80 |
|
||||
| M0 | Foundation: workspace, lints, quality gate, command registry, control channel, empty window | done 2026-10-14 (CI workflow written, not yet run: hosted on Forgejo, runners unknown) | ~2 (measured) |
|
||||
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | in progress (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor) | ~6 (2.5 measured for M1.1–M1.6) |
|
||||
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | not started | ~5 |
|
||||
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | not started | ~8 |
|
||||
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | not started | ~150 |
|
||||
| M5 | Debugger (Xdebug via DAP), PHPUnit/Pest runner, Composer, run configurations | not started | ~300 |
|
||||
| M6 | Own indexer and inspections; Symfony, Laravel, Shopware, WordPress support | not started | ~1,100 |
|
||||
|
|
@ -25,12 +25,13 @@ Alpha is reached when these six core workflows work end to end on macOS, Windows
|
|||
5. Commit, diff and switch branches with Git.
|
||||
6. Drive all of the above from the CLI, the control channel and MCP.
|
||||
|
||||
By the estimates above the alpha gate needs M1–M4 plus cross-platform verification, about 350 h.
|
||||
By the raw estimates the alpha gate needs M1–M4 plus cross-platform verification, about 350 h; calibrated with cycle C1's factor, about 35 h of agent time. Calendar time is dominated by reviews and owner decisions, not agent time.
|
||||
|
||||
## Revision history
|
||||
|
||||
| Date | Change | Summary |
|
||||
|---|---|---|
|
||||
| 2026-10-15 | minor | Cycle C1 review: M1–M3 hours recalibrated ×0.1, M0 CI note |
|
||||
| 2026-10-15 | minor | M1.6 tabs and editor |
|
||||
| 2026-10-15 | minor | M1.4 desktop bridge |
|
||||
| 2026-10-14 | minor | M1 in progress |
|
||||
|
|
|
|||
|
|
@ -35,7 +35,7 @@ Hours are the estimated agent wall-clock hours for one agent to reach behaviour
|
|||
| Plug-ins | 0.5 | 0% | everything | ~120 (est.) | — |
|
||||
| AI features | 0.5 | 0% | everything | ~60 (est.) | — |
|
||||
|
||||
Sum: about 2,920 h. Adding UI fidelity (~150 h), localization (~40 h), performance (~100 h) and stability hardening (~100 h) gives the ROADMAP's ~3,300 h to full parity. The range is wide (2,000–5,000 h): completion, inspections, refactoring and frameworks depend on an own type-inference engine whose size is hard to judge before M6.
|
||||
Sum: about 2,920 h. Adding UI fidelity (~150 h), localization (~40 h), performance (~100 h) and stability hardening (~100 h) gives the ROADMAP's ~3,300 h to full parity. These are the raw first estimates. Cycle C1 (M1.1–M1.6) took 2.5 h of agent time for 37 h estimated (factor 0.07), so the calibrated full-parity figure is ~330 h if that speed holds for deeper areas; the ROADMAP shows the range 300–3,300 h until M2/M3 give data for language work. The range is wide (2,000–5,000 h): completion, inspections, refactoring and frameworks depend on an own type-inference engine whose size is hard to judge before M6.
|
||||
|
||||
Weights were reviewed at the end of M0 and kept: nothing built so far gives a reason to change them.
|
||||
|
||||
|
|
@ -61,6 +61,7 @@ The project tree is the first user-visible feature (Project view 8%, estimated);
|
|||
|
||||
| Date | Change | Summary |
|
||||
|---|---|---|
|
||||
| 2026-10-15 | minor | Calibration note after cycle C1 (factor 0.07) |
|
||||
| 2026-10-15 | minor | Editor core 0% → 8% (estimated): tabs and editor in the app (M1.6) |
|
||||
| 2026-10-15 | minor | Project view 0% → 8% (estimated): tree runs against the engine in the app (M1.4) |
|
||||
| 2026-10-14 | minor | Project view evidence: project tree UI (M1.5), score unchanged |
|
||||
|
|
|
|||