PM: review cycle 3
M2 done in ~6.1 h measured agent time (factor 0.14); MVP ~12 h left at x0.15. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
parent
fc49e5e8a8
commit
9ccfc1bf6a
3 changed files with 11 additions and 10 deletions
|
|
@ -8,8 +8,8 @@ Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, t
|
|||
|---|---|---|---:|
|
||||
| M0 | Foundation: workspace, lints, quality gate, command registry, control channel, empty window | done 2026-10-14 (CI workflow written, not yet run: hosted on Forgejo, runners unknown) | ~2 (measured) |
|
||||
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | done 2026-10-16 (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.12 notifications, M1.13 C1 follow-ups, M1.8 command palette and keymap, M1.14 app icon, M1.9b settings dialog; C2 live checks pending, gaming mode) | ~5.6 (measured: C1 2.5, C2 3.1) |
|
||||
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | in progress (C3: M2.2 highlighting and `editor.reveal`, M2.3 search backend, M2.4 Find tool window, M2.5 symbol index, M2.6 go-to popup, M2.7 Structure tool window) | ~5 |
|
||||
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | not started | ~8 |
|
||||
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | done 2026-10-17 (C3: M2.1 tree-sitter syntax, M2.2 highlighting + `editor.reveal`, M2.3 search backend, M2.4 Find tool window, M2.5 symbol index + go-to commands, M2.6 go-to popup, M2.7 Structure tool window) | ~6.1 (measured) |
|
||||
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | not started | ~12 |
|
||||
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | not started | ~150 |
|
||||
| M5 | Debugger (Xdebug via DAP), PHPUnit/Pest runner, Composer, run configurations | not started | ~300 |
|
||||
| M6 | Own indexer and inspections; Symfony, Laravel, Shopware, WordPress support | not started | ~1,100 |
|
||||
|
|
@ -31,6 +31,7 @@ By the raw estimates the alpha gate needs M1–M4 plus cross-platform verificati
|
|||
|
||||
| Date | Change | Summary |
|
||||
|---|---|---|
|
||||
| 2026-10-17 | minor | M2 done (C3 review), M3 ~12 h at ×0.15 |
|
||||
| 2026-10-17 | minor | M2.6 go-to popup |
|
||||
| 2026-10-17 | minor | M2.7 Structure tool window |
|
||||
| 2026-10-17 | minor | M2.4 Find tool window |
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue