PM: review cycle 2
M1 done in ~5.6 h measured agent time (C1 2.5 h, C2 3.1 h); C2 factor 0.10 confirms the x0.1 calibration. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
parent
0316e7e5bd
commit
d12a517009
3 changed files with 6 additions and 4 deletions
|
|
@ -14,8 +14,8 @@ Lutra is a clean-room, open-source PHP IDE with a Rust core and a Tauri + Vue in
|
|||
|---|---|---|
|
||||
| **Feature breadth** (PhpStorm's actions, tool windows, languages, integrations exist) | **<1%** (project tool window, editor tabs; no inventory to count against yet) | estimated |
|
||||
| **Feature depth** (weighted by use, scored by behaviour) | **~1.6%** (Editor core 9% × weight 12, Project view 8% × weight 6, Settings 7% × weight 1, of 101) | estimated |
|
||||
| **To MVP (M3)** | **~13 h left** (M1 done: C1 2.5 h measured, C2 time in the cycle review; M2 ~5 h, M3 ~8 h); was ~190 h before calibration | estimated (×0.1 from cycle C1) |
|
||||
| **To full parity** | **~330 h** if cycle C1's speed holds (range 300–3,300 h; deep areas such as type inference and inspections have no data yet) | estimated |
|
||||
| **To MVP (M3)** | **~13 h left** (M1 done in ~5.6 h measured: C1 2.5 h, C2 3.1 h; M2 ~5 h, M3 ~8 h); was ~190 h before calibration | estimated (×0.1; C1 factor 0.07, C2 factor 0.10) |
|
||||
| **To full parity** | **~330 h** if the speed of cycles C1 and C2 holds (range 300–3,300 h; deep areas such as type inference and inspections have no data yet) | estimated |
|
||||
|
||||
Hours are agent wall-clock hours for one agent. M0 took about 2 h of active agent time (measured from the session, excluding toolchain installation and waiting for owner decisions). Later milestones are estimated far more conservatively per line of code, because editor, language and UI work need integration, debugging and visual checks that the foundation did not. Estimates are recalibrated after each cycle from task start times and commit timestamps. Cycle C1 (M1.1–M1.6) took 2.5 h of agent time for 37 h estimated (factor 0.07); M1–M3 hours are scaled by ×0.1 since then, and the per-area hours below are the raw first estimates (multiply by ~0.1 for the calibrated value). PhpStorm is **not** inspected: the clean-room rule in [`AGENTS.md`](AGENTS.md) forbids it, so everything is measured from our code against public documentation.
|
||||
|
||||
|
|
@ -91,6 +91,7 @@ All hours estimated. Weights, evidence and the missing items per area: [target-a
|
|||
|
||||
| Date | Change | Summary |
|
||||
|---|---|---|
|
||||
| 2026-10-16 | minor | Cycle C2 review: M1 measured at ~5.6 h, C2 factor 0.10 confirms ×0.1 |
|
||||
| 2026-10-16 | minor | M1.9b: M1 done, stage line, Settings row 7% (est.), progress log |
|
||||
| 2026-10-16 | minor | M1.8: progress log, agent automation note (scores unchanged) |
|
||||
| 2026-10-16 | minor | M1.12: progress log (headline unchanged) |
|
||||
|
|
|
|||
|
|
@ -39,8 +39,8 @@ Known smaller items from M0:
|
|||
|
||||
| Date | Change | Summary |
|
||||
|---|---|---|
|
||||
| 2026-10-16 | minor | G3: command palette, global keymap, UI commands (M1.8) |
|
||||
| 2026-10-16 | minor | G3: settings dialog, theme picker (M1.9b) |
|
||||
| 2026-10-16 | minor | G3: command palette, global keymap, UI commands (M1.8) |
|
||||
| 2026-10-16 | minor | G2/G3: re-open focuses the tab, open buffers' folders watched, truncated listings shown (M1.13) |
|
||||
| 2026-10-15 | minor | G14 note: English message catalog (M1.11) |
|
||||
| 2026-10-15 | minor | G2 shrunk: tabs and editor (M1.6) |
|
||||
|
|
|
|||
|
|
@ -7,7 +7,7 @@ Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, t
|
|||
| Milestone | Goal | State | Hours |
|
||||
|---|---|---|---:|
|
||||
| M0 | Foundation: workspace, lints, quality gate, command registry, control channel, empty window | done 2026-10-14 (CI workflow written, not yet run: hosted on Forgejo, runners unknown) | ~2 (measured) |
|
||||
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | done 2026-10-16 (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.12 notifications, M1.13 C1 follow-ups, M1.8 command palette and keymap, M1.14 app icon, M1.9b settings dialog; C2 live checks pending, gaming mode) | ~6 (2.5 measured for M1.1–M1.6) |
|
||||
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | done 2026-10-16 (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.12 notifications, M1.13 C1 follow-ups, M1.8 command palette and keymap, M1.14 app icon, M1.9b settings dialog; C2 live checks pending, gaming mode) | ~5.6 (measured: C1 2.5, C2 3.1) |
|
||||
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | not started | ~5 |
|
||||
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | not started | ~8 |
|
||||
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | not started | ~150 |
|
||||
|
|
@ -31,6 +31,7 @@ By the raw estimates the alpha gate needs M1–M4 plus cross-platform verificati
|
|||
|
||||
| Date | Change | Summary |
|
||||
|---|---|---|
|
||||
| 2026-10-16 | minor | Cycle C2 review: M1 hours measured |
|
||||
| 2026-10-16 | minor | M1.9b settings dialog; M1 done |
|
||||
| 2026-10-16 | minor | M1.8 command palette, global keymap, UI commands |
|
||||
| 2026-10-16 | minor | M1.12 notifications |
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue