PM: review cycle 2
M1 done in ~5.6 h measured agent time (C1 2.5 h, C2 3.1 h); C2 factor 0.10 confirms the x0.1 calibration. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
parent
0316e7e5bd
commit
d12a517009
3 changed files with 6 additions and 4 deletions
|
|
@ -39,8 +39,8 @@ Known smaller items from M0:
|
|||
|
||||
| Date | Change | Summary |
|
||||
|---|---|---|
|
||||
| 2026-10-16 | minor | G3: command palette, global keymap, UI commands (M1.8) |
|
||||
| 2026-10-16 | minor | G3: settings dialog, theme picker (M1.9b) |
|
||||
| 2026-10-16 | minor | G3: command palette, global keymap, UI commands (M1.8) |
|
||||
| 2026-10-16 | minor | G2/G3: re-open focuses the tab, open buffers' folders watched, truncated listings shown (M1.13) |
|
||||
| 2026-10-15 | minor | G14 note: English message catalog (M1.11) |
|
||||
| 2026-10-15 | minor | G2 shrunk: tabs and editor (M1.6) |
|
||||
|
|
|
|||
|
|
@ -7,7 +7,7 @@ Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, t
|
|||
| Milestone | Goal | State | Hours |
|
||||
|---|---|---|---:|
|
||||
| M0 | Foundation: workspace, lints, quality gate, command registry, control channel, empty window | done 2026-10-14 (CI workflow written, not yet run: hosted on Forgejo, runners unknown) | ~2 (measured) |
|
||||
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | done 2026-10-16 (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.12 notifications, M1.13 C1 follow-ups, M1.8 command palette and keymap, M1.14 app icon, M1.9b settings dialog; C2 live checks pending, gaming mode) | ~6 (2.5 measured for M1.1–M1.6) |
|
||||
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | done 2026-10-16 (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.12 notifications, M1.13 C1 follow-ups, M1.8 command palette and keymap, M1.14 app icon, M1.9b settings dialog; C2 live checks pending, gaming mode) | ~5.6 (measured: C1 2.5, C2 3.1) |
|
||||
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | not started | ~5 |
|
||||
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | not started | ~8 |
|
||||
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | not started | ~150 |
|
||||
|
|
@ -31,6 +31,7 @@ By the raw estimates the alpha gate needs M1–M4 plus cross-platform verificati
|
|||
|
||||
| Date | Change | Summary |
|
||||
|---|---|---|
|
||||
| 2026-10-16 | minor | Cycle C2 review: M1 hours measured |
|
||||
| 2026-10-16 | minor | M1.9b settings dialog; M1 done |
|
||||
| 2026-10-16 | minor | M1.8 command palette, global keymap, UI commands |
|
||||
| 2026-10-16 | minor | M1.12 notifications |
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue