PM: review cycle 2
Some checks are pending
ci / ci (macos-15) (push) Waiting to run
ci / ci (ubuntu-24.04) (push) Waiting to run
ci / ci (windows-2025) (push) Waiting to run

M1 done in ~5.6 h measured agent time (C1 2.5 h, C2 3.1 h);
C2 factor 0.10 confirms the x0.1 calibration.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
danny 2026-10-16 21:19:27 +02:00
parent 0316e7e5bd
commit d12a517009
3 changed files with 6 additions and 4 deletions

View file

@ -7,7 +7,7 @@ Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, t
| Milestone | Goal | State | Hours |
|---|---|---|---:|
| M0 | Foundation: workspace, lints, quality gate, command registry, control channel, empty window | done 2026-10-14 (CI workflow written, not yet run: hosted on Forgejo, runners unknown) | ~2 (measured) |
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | done 2026-10-16 (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.12 notifications, M1.13 C1 follow-ups, M1.8 command palette and keymap, M1.14 app icon, M1.9b settings dialog; C2 live checks pending, gaming mode) | ~6 (2.5 measured for M1.1–M1.6) |
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | done 2026-10-16 (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.12 notifications, M1.13 C1 follow-ups, M1.8 command palette and keymap, M1.14 app icon, M1.9b settings dialog; C2 live checks pending, gaming mode) | ~5.6 (measured: C1 2.5, C2 3.1) |
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | not started | ~5 |
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | not started | ~8 |
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | not started | ~150 |
@ -31,6 +31,7 @@ By the raw estimates the alpha gate needs M1–M4 plus cross-platform verificati
| Date | Change | Summary |
|---|---|---|
| 2026-10-16 | minor | Cycle C2 review: M1 hours measured |
| 2026-10-16 | minor | M1.9b settings dialog; M1 done |
| 2026-10-16 | minor | M1.8 command palette, global keymap, UI commands |
| 2026-10-16 | minor | M1.12 notifications |