M1.4: desktop bridge: engine events to the window, folder picker, live project tree

The desktop host publishes every engine event, from commands and from a
pump thread that calls Engine::pump_vfs every 100 ms, to control channel
subscribers and to the window as the Tauri event engine://event, in engine
order. ui/src/ipc.ts gets a typed onEngineEvent; its first subscription
calls engine_ready, and the host replays the current project and buffers,
so a project opened from the command line (lutra-desktop --control PORT
PATH) reaches the UI. project.openDialog returns Effect::PickFolder; the
host shows the native folder picker (tauri-plugin-dialog, licence checked)
and opens the choice, one picker at a time, cancel is not an error.
Capabilities shrink to event listen/unlisten.

Contract fix: the M1.5 project UI assumed shapes the engine does not use.
engineEvents.ts now translates engine events ({kind: projectOpened, ...})
and project.children results ({dir, entries, truncated}) into the UI types,
keeping role and truncated; the store maps listings through
toTreeEntries() and the project tests use the real engine shapes.

Verified in the running app on Windows 11: tree of a project given on the
command line, expanding src, a file created on disk appearing live, the
folder picker opening one dialog and opening the chosen folder.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
danny 2026-10-15 06:41:49 +02:00
parent 69130d1efb
commit dd98636de4
23 changed files with 751 additions and 99 deletions

View file

@ -1,13 +1,13 @@
# Milestones
> **Status:** M0 done, M1 in progress · **Last updated:** 2026-10-14
> **Status:** M0 done, M1 in progress · **Last updated:** 2026-10-15
Hours are agent wall-clock hours for one agent; M0 is measured, the rest estimated.
| Milestone | Goal | State | Hours |
|---|---|---|---:|
| M0 | Foundation: workspace, lints, quality gate, command registry, control channel, empty window | done 2026-10-14 (CI workflow written, not yet run: no remote) | ~2 (measured) |
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | in progress (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace) | ~60 |
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | in progress (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge) | ~60 |
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | not started | ~50 |
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | not started | ~80 |
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | not started | ~150 |
@ -31,6 +31,7 @@ By the estimates above the alpha gate needs M1–M4 plus cross-platform verifica
| Date | Change | Summary |
|---|---|---|
| 2026-10-15 | minor | M1.4 desktop bridge |
| 2026-10-14 | minor | M1 in progress |
| 2026-10-14 | minor | M0 done; hours per milestone |
| 2026-10-13 | major | Initial milestones |