PM: C4 review, M3 done and MVP feature-complete
Some checks failed
ci / ci (macos-15) (push) Has been cancelled
ci / ci (ubuntu-24.04) (push) Has been cancelled
ci / ci (windows-2025) (push) Has been cancelled

Breadth recounted against the feature map (32/155), M3 measured at
~14 h of agent time (factor 0.17), full-parity hours re-scaled.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
danny 2026-10-22 18:54:43 +02:00
parent 7420d5bdae
commit e5891ddeb4
4 changed files with 13 additions and 10 deletions

View file

@ -2,14 +2,14 @@
> **Status:** M0 done, M1 done, M2 in progress · **Last updated:** 2026-10-22
Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, the rest estimated. Since cycle C1 (factor 0.07) M1–M3 are scaled ×0.1; M4–M6 keep their first raw estimates (multiply by ~0.1 for the calibrated value).
Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, the rest estimated. Since cycle C1 (factor 0.07) M1–M3 were scaled ×0.1 to ×0.15 (measured factors: C1 0.07, C2 0.10, C3 0.14, C4 0.17; next cycle ×0.18); M4–M6 keep their first raw estimates (multiply by ~0.1 for the calibrated value).
| Milestone | Goal | State | Hours |
|---|---|---|---:|
| M0 | Foundation: workspace, lints, quality gate, command registry, control channel, empty window | done 2026-10-14 (CI workflow written, not yet run: hosted on Forgejo, runners unknown) | ~2 (measured) |
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | done 2026-10-16 (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.12 notifications, M1.13 C1 follow-ups, M1.8 command palette and keymap, M1.14 app icon, M1.9b settings dialog; C2 live checks pending, gaming mode) | ~5.6 (measured: C1 2.5, C2 3.1) |
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | done 2026-10-17 (C3: M2.1 tree-sitter syntax, M2.2 highlighting + `editor.reveal`, M2.3 search backend, M2.4 Find tool window, M2.5 symbol index + go-to commands, M2.6 go-to popup, M2.7 Structure tool window) | ~6.1 (measured) |
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | in progress (M3.7 CLI and single instance, M3.8 MCP server, M3.10 autosave, M3.6 integrated terminal, M3.3 engine wiring and diagnostics, M3.4 completion, hover and signature help, M3.5 definition, references and rename done) | ~12 |
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | done 2026-10-22 (C4: M3.1 PHP detection and Phpactor download, M3.2 LSP client, M3.3 engine wiring and diagnostics, M3.4 completion, hover and signature help, M3.5 definition, references and rename, M3.6 integrated terminal, M3.7 CLI and single instance, M3.8 MCP server, M3.9 app menu, M3.10 autosave; live check with real key presses pending) | ~14 (measured) |
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | not started | ~150 |
| M5 | Debugger (Xdebug via DAP), PHPUnit/Pest runner, Composer, run configurations | not started | ~300 |
| M6 | Own indexer and inspections; Symfony, Laravel, Shopware, WordPress support | not started | ~1,100 |
@ -34,6 +34,7 @@ By the raw estimates the alpha gate needs M1–M4 plus cross-platform verificati
| Date | Change | Summary |
|---|---|---|
| 2026-10-22 | minor | C4 review: M3 done (~14 h measured) |
| 2026-10-22 | minor | M3.5 definition, references, rename |
| 2026-10-22 | minor | M3.4 completion, hover and signature help |
| 2026-10-21 | minor | M3.3 engine wiring and diagnostics |