M4.2: Changes tool window with staging and commit
A Changes tab in the bottom panel (ui/src/components/vcs/changes/): the project's changed files from git.status in Staged, Changes and Untracked groups, re-read on start, project open, gitChanged and vcs.refresh (serialised). A checkbox per file and per group stages or unstages through git.stage / git.unstage (a staged rename passes both paths); Space stages, Enter or a double-click runs vcs.showDiff when provided, else opens the file. A message box with Amend and Commit (also Mod+Enter) runs flushDirty() first, cancels when a save fails, then git.commit and toasts the short hash. All git calls go through runWaiting. UI commands vcs.openChanges (Mod+Alt+G), vcs.commit (Mod+K, focuses the message box) and vcs.refresh in a new Git menu group; gitChanged added to EngineEventPayload. 19 Vitest tests; palette, menu and catalog tests follow the new commands. Docs: architecture, gaps G8, Git parity row 4% (est.), ui/tooling checklists, roadmap M4 row, ROADMAP depth ~5.4% and log, README. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
parent
8701f50d37
commit
f67f6b9f7c
18 changed files with 1792 additions and 23 deletions
|
|
@ -1,6 +1,6 @@
|
|||
# Milestones
|
||||
|
||||
> **Status:** M0–M3 done, M4 in progress (C5) · **Last updated:** 2026-10-24
|
||||
> **Status:** M0–M3 done, M4 in progress (C5: Git backend, Changes window) · **Last updated:** 2026-10-25
|
||||
|
||||
Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, the rest estimated. Since cycle C1 (factor 0.07) M1–M3 were scaled ×0.1 to ×0.15 (measured factors: C1 0.07, C2 0.10, C3 0.14, C4 0.17; next cycle ×0.18); M4–M6 keep their first raw estimates (multiply by ~0.1 for the calibrated value).
|
||||
|
||||
|
|
@ -10,7 +10,7 @@ Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, t
|
|||
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | done 2026-10-16 (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.12 notifications, M1.13 C1 follow-ups, M1.8 command palette and keymap, M1.14 app icon, M1.9b settings dialog; C2 live checks pending, gaming mode) | ~5.6 (measured: C1 2.5, C2 3.1) |
|
||||
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | done 2026-10-17 (C3: M2.1 tree-sitter syntax, M2.2 highlighting + `editor.reveal`, M2.3 search backend, M2.4 Find tool window, M2.5 symbol index + go-to commands, M2.6 go-to popup, M2.7 Structure tool window) | ~6.1 (measured) |
|
||||
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | done 2026-10-22 (C4: M3.1 PHP detection and Phpactor download, M3.2 LSP client, M3.3 engine wiring and diagnostics, M3.4 completion, hover and signature help, M3.5 definition, references and rename, M3.6 integrated terminal, M3.7 CLI and single instance, M3.8 MCP server, M3.9 app menu, M3.10 autosave; live check with real key presses pending) | ~14 (measured) |
|
||||
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | in progress (C5: M4.1 backend done) | ~148 |
|
||||
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | in progress (C5: M4.1 backend, M4.2 Changes window done) | ~138 |
|
||||
| M5 | Debugger (Xdebug via DAP), PHPUnit/Pest runner, Composer, run configurations | not started | ~300 |
|
||||
| M6 | Own indexer and inspections; Symfony, Laravel, Shopware, WordPress support | not started | ~1,100 |
|
||||
| M7 | Workbench and tools: Deployment (FTP/SFTP/local mappings, upload/download, compare with server, save before deploy, optional upload on save per server), Local History, diff tool (files/folders), scratch files, macros, keymap editor, user themes, plug-in system, Database tools and SQL, HTTP Client, SSH/Docker/Vagrant/WSL, File Watchers, external tools, TODO view, tasks and contexts | not started | ~900 |
|
||||
|
|
@ -34,6 +34,7 @@ By the raw estimates the alpha gate needs M1–M4 plus cross-platform verificati
|
|||
|
||||
| Date | Change | Summary |
|
||||
|---|---|---|
|
||||
| 2026-10-25 | minor | M4.2 Changes tool window |
|
||||
| 2026-10-24 | minor | M4.1 Git backend; M4 in progress |
|
||||
| 2026-10-22 | minor | C4 review: M3 done (~14 h measured) |
|
||||
| 2026-10-22 | minor | M3.5 definition, references, rename |
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue