M4.4: Git gutter change markers and status colours in tree and tabs

- git.lineChanges {id} -> {ranges: [{kind, startLine, endLine}], version}:
  the buffer against its index blob, line diff with similar (Myers +
  Replace, no Compact) off the lock, CRLF-safe; index texts cached per
  path and dropped on gitChanged (State::emit -> git_lines::observe)
- editor gutter markers for added, modified and deleted lines, queried
  150 ms after edits, on show and on gitChanged, mapped through edits
- vcsStatus store (git.status on projectOpened and gitChanged, no
  polling) colouring file names in the project tree and editor tabs with
  the --lt-vcs-* tokens; contrast also checked on the active tab
- tests: unit and property tests, real-repo engine tests, Vitest
- docs: architecture, parity, gaps, roadmap, ui-parity, ROADMAP

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
danny 2026-10-25 17:36:59 +01:00
parent 56dadc91dc
commit fc8ae6c2e3
24 changed files with 1970 additions and 20 deletions

View file

@ -1,6 +1,6 @@
# Milestones
> **Status:** M0–M3 done, M4 in progress (C5: Git backend, Changes window) · **Last updated:** 2026-10-25
> **Status:** M0–M3 done, M4 in progress (C5: Git backend, Changes window, gutter markers and status colours) · **Last updated:** 2026-10-25
Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, the rest estimated. Since cycle C1 (factor 0.07) M1–M3 were scaled ×0.1 to ×0.15 (measured factors: C1 0.07, C2 0.10, C3 0.14, C4 0.17; next cycle ×0.18); M4–M6 keep their first raw estimates (multiply by ~0.1 for the calibrated value).
@ -10,7 +10,7 @@ Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, t
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | done 2026-10-16 (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.12 notifications, M1.13 C1 follow-ups, M1.8 command palette and keymap, M1.14 app icon, M1.9b settings dialog; C2 live checks pending, gaming mode) | ~5.6 (measured: C1 2.5, C2 3.1) |
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | done 2026-10-17 (C3: M2.1 tree-sitter syntax, M2.2 highlighting + `editor.reveal`, M2.3 search backend, M2.4 Find tool window, M2.5 symbol index + go-to commands, M2.6 go-to popup, M2.7 Structure tool window) | ~6.1 (measured) |
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | done 2026-10-22 (C4: M3.1 PHP detection and Phpactor download, M3.2 LSP client, M3.3 engine wiring and diagnostics, M3.4 completion, hover and signature help, M3.5 definition, references and rename, M3.6 integrated terminal, M3.7 CLI and single instance, M3.8 MCP server, M3.9 app menu, M3.10 autosave; live check with real key presses pending) | ~14 (measured) |
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | in progress (C5: M4.1 backend, M4.2 Changes window done) | ~138 |
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | in progress (C5: M4.1 backend, M4.2 Changes window, M4.4 gutter markers and status colours done) | ~136 |
| M5 | Debugger (Xdebug via DAP), PHPUnit/Pest runner, Composer, run configurations | not started | ~300 |
| M6 | Own indexer and inspections; Symfony, Laravel, Shopware, WordPress support | not started | ~1,100 |
| M7 | Workbench and tools: Deployment (FTP/SFTP/local mappings, upload/download, compare with server, save before deploy, optional upload on save per server), Local History, diff tool (files/folders), scratch files, macros, keymap editor, user themes, plug-in system, Database tools and SQL, HTTP Client, SSH/Docker/Vagrant/WSL, File Watchers, external tools, TODO view, tasks and contexts | not started | ~900 |
@ -34,6 +34,7 @@ By the raw estimates the alpha gate needs M1–M4 plus cross-platform verificati
| Date | Change | Summary |
|---|---|---|
| 2026-10-25 | minor | M4.4 gutter markers and status colours |
| 2026-10-25 | minor | M4.2 Changes tool window |
| 2026-10-24 | minor | M4.1 Git backend; M4 in progress |
| 2026-10-22 | minor | C4 review: M3 done (~14 h measured) |