Stage line, feature breadth estimate, M1-M3 hours recalibrated x0.1
after cycle C1 (2.5 h agent time for 37 h estimated).
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- Editor area with tab bar, CodeMirror 6 view, close question and notices
(ui/src/components/editor/, ui/src/stores/editor.ts), mounted in App.vue;
the project tree opens files through the editor store.
- BufferSync: local edits to buffer.edit against the confirmed version,
one call in flight, resync on stale_version or newer bufferChanged with
rebase of unsent changes; EngineText maps CodeMirror positions to engine
UTF-16 offsets for CRLF text.
- Save, save all and close from engine default shortcuts via listCommands.
- Dirty marker, Save / Don't Save / Cancel, non-blocking notice when a
dirty file changes or disappears on disk.
- Vitest: keystroke bursts with stale versions and remote edits (LF and
CRLF), mapping, store and component tests against a fake engine.
- Progress docs: Editor core 8% (est.), depth ~1.4%, G2, ui-parity tabs,
M1 row, architecture, README status.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
The desktop host publishes every engine event, from commands and from a
pump thread that calls Engine::pump_vfs every 100 ms, to control channel
subscribers and to the window as the Tauri event engine://event, in engine
order. ui/src/ipc.ts gets a typed onEngineEvent; its first subscription
calls engine_ready, and the host replays the current project and buffers,
so a project opened from the command line (lutra-desktop --control PORT
PATH) reaches the UI. project.openDialog returns Effect::PickFolder; the
host shows the native folder picker (tauri-plugin-dialog, licence checked)
and opens the choice, one picker at a time, cancel is not an error.
Capabilities shrink to event listen/unlisten.
Contract fix: the M1.5 project UI assumed shapes the engine does not use.
engineEvents.ts now translates engine events ({kind: projectOpened, ...})
and project.children results ({dir, entries, truncated}) into the UI types,
keeping role and truncated; the store maps listings through
toTreeEntries() and the project tests use the real engine shapes.
Verified in the running app on Windows 11: tree of a project given on the
command line, expanding src, a file created on disk appearing live, the
folder picker opening one dialog and opening the chosen folder.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
MVP (M1-M3) about 190 agent hours, full parity about 3,300 hours (range
2,000-5,000), all marked estimated. M0 measured at about 2 hours of active
agent time. Hours per area in target-app-parity, per gap in gaps.md and
per milestone in roadmap.md; ROADMAP and README status updated.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>