# Milestones > **Status:** M0 done, current focus M1 · **Last updated:** 2026-10-14 Hours are agent wall-clock hours for one agent; M0 is measured, the rest estimated. | Milestone | Goal | State | Hours | |---|---|---|---:| | M0 | Foundation: workspace, lints, quality gate, command registry, control channel, empty window | done 2026-10-14 (CI workflow written, not yet run: no remote) | ~2 (measured) | | M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | not started | ~60 | | M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | not started | ~50 | | M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | not started | ~80 | | M4 | Git: status, diff, commit, branches, log, blame, conflicts | not started | ~150 | | M5 | Debugger (Xdebug via DAP), PHPUnit/Pest runner, Composer, run configurations | not started | ~300 | | M6 | Own indexer and inspections; Symfony, Laravel, Shopware, WordPress support | not started | ~1,100 | ## Alpha gate Alpha is reached when these six core workflows work end to end on macOS, Windows and Linux, with save and reopen: 1. Open a project, browse and edit files, save, recover after a crash. 2. Navigate: go to file, class, symbol and definition; find in files. 3. Write code with completion and diagnostics. 4. Run commands in the integrated terminal. 5. Commit, diff and switch branches with Git. 6. Drive all of the above from the CLI, the control channel and MCP. By the estimates above the alpha gate needs M1–M4 plus cross-platform verification, about 350 h. ## Revision history | Date | Change | Summary | |---|---|---| | 2026-10-14 | minor | M0 done; hours per milestone | | 2026-10-13 | major | Initial milestones |