# Milestones > **Status:** M0 done, M1 done, M2 in progress · **Last updated:** 2026-10-16 Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, the rest estimated. Since cycle C1 (factor 0.07) M1–M3 are scaled ×0.1; M4–M6 keep their first raw estimates (multiply by ~0.1 for the calibrated value). | Milestone | Goal | State | Hours | |---|---|---|---:| | M0 | Foundation: workspace, lints, quality gate, command registry, control channel, empty window | done 2026-10-14 (CI workflow written, not yet run: hosted on Forgejo, runners unknown) | ~2 (measured) | | M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | done 2026-10-16 (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.12 notifications, M1.13 C1 follow-ups, M1.8 command palette and keymap, M1.14 app icon, M1.9b settings dialog; C2 live checks pending, gaming mode) | ~5.6 (measured: C1 2.5, C2 3.1) | | M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | in progress (C3: M2.2 highlighting and `editor.reveal`) | ~5 | | M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | not started | ~8 | | M4 | Git: status, diff, commit, branches, log, blame, conflicts | not started | ~150 | | M5 | Debugger (Xdebug via DAP), PHPUnit/Pest runner, Composer, run configurations | not started | ~300 | | M6 | Own indexer and inspections; Symfony, Laravel, Shopware, WordPress support | not started | ~1,100 | ## Alpha gate Alpha is reached when these six core workflows work end to end on macOS, Windows and Linux, with save and reopen: 1. Open a project, browse and edit files, save, recover after a crash. 2. Navigate: go to file, class, symbol and definition; find in files. 3. Write code with completion and diagnostics. 4. Run commands in the integrated terminal. 5. Commit, diff and switch branches with Git. 6. Drive all of the above from the CLI, the control channel and MCP. By the raw estimates the alpha gate needs M1–M4 plus cross-platform verification, about 350 h; calibrated with cycle C1's factor, about 35 h of agent time. Calendar time is dominated by reviews and owner decisions, not agent time. ## Revision history | Date | Change | Summary | |---|---|---| | 2026-10-16 | minor | M2 in progress: M2.2 highlighting and `editor.reveal` | | 2026-10-16 | minor | Cycle C2 review: M1 hours measured | | 2026-10-16 | minor | M1.9b settings dialog; M1 done | | 2026-10-16 | minor | M1.8 command palette, global keymap, UI commands | | 2026-10-16 | minor | M1.12 notifications | | 2026-10-16 | minor | M1.13 C1 follow-ups | | 2026-10-16 | minor | M1.7 recovery journal | | 2026-10-16 | minor | M1.9a settings backend, M1.10 themes | | 2026-10-15 | minor | M1.11 message catalog | | 2026-10-15 | minor | Cycle C1 review: M1–M3 hours recalibrated ×0.1, M0 CI note | | 2026-10-15 | minor | M1.6 tabs and editor | | 2026-10-15 | minor | M1.4 desktop bridge | | 2026-10-14 | minor | M1 in progress | | 2026-10-14 | minor | M0 done; hours per milestone | | 2026-10-13 | major | Initial milestones |