Lutra/docs/roadmap.md
danny da58c83158
Some checks are pending
ci / ci (macos-15) (push) Waiting to run
ci / ci (ubuntu-24.04) (push) Waiting to run
ci / ci (windows-2025) (push) Waiting to run
PM: C6 review, M4 done, Git 16%, depth ~6.4%
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-30 18:16:50 +01:00

6.2 KiB
Raw Permalink Blame History

Milestones

Status: M0–M3 done, M4 in progress (C5: Git backend, Changes window, gutter markers and status colours, diff viewer, branches; C6: log, remotes, stash) · Last updated: 2026-10-28

Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, the rest estimated. Since cycle C1 (factor 0.07) M1–M3 were scaled ×0.1 to ×0.15 (measured factors: C1 0.07, C2 0.10, C3 0.14, C4 0.17; next cycle ×0.18); M4–M6 keep their first raw estimates (multiply by ~0.1 for the calibrated value).

Milestone Goal State Hours
M0 Foundation: workspace, lints, quality gate, command registry, control channel, empty window done 2026-10-14 (CI workflow written, not yet run: hosted on Forgejo, runners unknown) ~2 (measured)
M1 Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes done 2026-10-16 (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.12 notifications, M1.13 C1 follow-ups, M1.8 command palette and keymap, M1.14 app icon, M1.9b settings dialog; C2 live checks pending, gaming mode) ~5.6 (measured: C1 2.5, C2 3.1)
M2 Syntax and search: highlighting, structure, find in files, go to file/class/symbol done 2026-10-17 (C3: M2.1 tree-sitter syntax, M2.2 highlighting + editor.reveal, M2.3 search backend, M2.4 Find tool window, M2.5 symbol index + go-to commands, M2.6 go-to popup, M2.7 Structure tool window) ~6.1 (measured)
M3 LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; lutra CLI and MCP — MVP done 2026-10-22 (C4: M3.1 PHP detection and Phpactor download, M3.2 LSP client, M3.3 engine wiring and diagnostics, M3.4 completion, hover and signature help, M3.5 definition, references and rename, M3.6 integrated terminal, M3.7 CLI and single instance, M3.8 MCP server, M3.9 app menu, M3.10 autosave; live check with real key presses pending) ~14 (measured)
M4 Git: status, diff, commit, branches, log, blame, conflicts done 2026-10-30 (C5: M4.1 backend, M4.2 Changes window, M4.4 gutter markers and status colours, M4.3 diff viewer, M4.5 branches; C6: M4.6 log, M4.7 blame, M4.8 merge conflicts, M4.9 stash, M4.10 remotes with clone and remote management) ~12 (measured: C5 M4.1–M4.5 ~5.9 h, C6 M4.6–M4.10 ~6.4 h)
M5 Debugger (Xdebug via DAP), PHPUnit/Pest runner, Composer, run configurations not started ~300
M6 Own indexer and inspections; Symfony, Laravel, Shopware, WordPress support not started ~1,100
M7 Workbench and tools: Deployment (FTP/SFTP/local mappings, upload/download, compare with server, save before deploy, optional upload on save per server), Local History, diff tool (files/folders), scratch files, macros, keymap editor, user themes, plug-in system, Database tools and SQL, HTTP Client, SSH/Docker/Vagrant/WSL, File Watchers, external tools, TODO view, tasks and contexts not started ~900
M8 Web languages: JavaScript/TypeScript intelligence (via LSP), Node.js and npm, Vue, CSS/Sass/Less, Emmet, Twig and Blade, XML, OpenAPI, test runners for JS not started ~400
M9 Remote development, Dev Containers, AI features (chat, inline prompts, commit messages; MCP already in M3), diagrams, IDE scripting console, Vim mode, LightEdit mode not started ~350

Alpha gate

Alpha is reached when these six core workflows work end to end on macOS, Windows and Linux, with save and reopen:

  1. Open a project, browse and edit files, save, recover after a crash.
  2. Navigate: go to file, class, symbol and definition; find in files.
  3. Write code with completion and diagnostics.
  4. Run commands in the integrated terminal.
  5. Commit, diff and switch branches with Git.
  6. Drive all of the above from the CLI, the control channel and MCP.

By the raw estimates the alpha gate needs M1–M4 plus cross-platform verification, about 350 h; calibrated with cycle C1's factor, about 35 h of agent time. Calendar time is dominated by reviews and owner decisions, not agent time.

Revision history

Date Change Summary
2026-10-30 minor C6 review: M4 done
2026-10-30 minor M4.9 stash
2026-10-28 minor M4.6 log and file history
2026-10-28 minor M4.10 remotes (fetch, pull, push, clone, manage remotes)
2026-10-28 minor M4.8 merge conflicts
2026-10-26 minor M4.5 branch widget and popup
2026-10-26 minor M4.3 diff viewer
2026-10-25 minor M4.4 gutter markers and status colours
2026-10-25 minor M4.2 Changes tool window
2026-10-24 minor M4.1 Git backend; M4 in progress
2026-10-22 minor C4 review: M3 done (~14 h measured)
2026-10-22 minor M3.5 definition, references, rename
2026-10-22 minor M3.4 completion, hover and signature help
2026-10-21 minor M3.3 engine wiring and diagnostics
2026-10-20 minor M3.10 autosave
2026-10-18 minor M3.6 integrated terminal
2026-10-18 minor M7–M9 added from the full PhpStorm help inventory (155 feature units); raw hours, calibrate ×0.15
2026-10-19 minor M3.8 MCP server
2026-10-17 minor M3.7 CLI and single instance
2026-10-17 minor M2 done (C3 review), M3 ~12 h at ×0.15
2026-10-17 minor M2.6 go-to popup
2026-10-17 minor M2.7 Structure tool window
2026-10-17 minor M2.4 Find tool window
2026-10-16 minor M2 in progress: M2.2 highlighting and editor.reveal
2026-10-16 minor Cycle C2 review: M1 hours measured
2026-10-16 minor M1.9b settings dialog; M1 done
2026-10-16 minor M1.8 command palette, global keymap, UI commands
2026-10-16 minor M1.12 notifications
2026-10-16 minor M1.13 C1 follow-ups
2026-10-16 minor M1.7 recovery journal
2026-10-16 minor M1.9a settings backend, M1.10 themes
2026-10-15 minor M1.11 message catalog
2026-10-15 minor Cycle C1 review: M1–M3 hours recalibrated ×0.1, M0 CI note
2026-10-15 minor M1.6 tabs and editor
2026-10-15 minor M1.4 desktop bridge
2026-10-14 minor M1 in progress
2026-10-14 minor M0 done; hours per milestone
2026-10-13 major Initial milestones