Lutra/docs/gaps.md
danny 3f190a635e M1.2: native file watching via notify
- notify 8.2.0 (CC0-1.0) behind the existing Watcher API, allowed by a
  crate-scoped [[licenses.exceptions]] entry in deny.toml (owner
  decision 2026-10-14, noted in AGENTS.md and NOTICE).
- Native notifications only mark directories dirty; after 100 ms of
  quiet (at most 10 intervals) dirty dirs are rescanned and diffed, so
  events, debouncing and rename pairing match the polling backend.
- Polling stays as fallback when the native watcher cannot start, and
  per directory when a native watch is refused. Lost events or watcher
  errors trigger a full rescan; root loss is checked on every tick.
- Additive API: WatchOptions::backend (Auto, Polling) and
  Watcher::is_native.
- Watch tests run on both backends (34 vfs tests on Windows).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-14 19:43:15 +02:00

2.4 KiB
Raw Blame History

Gaps

Status: M0 closed G1; estimates added · Last updated: 2026-10-14

Every known shortfall, ranked. This is the work list: unless the owner gives a task, take the highest open gap. Hours are agent wall-clock hours for one agent, all estimated.

# Gap Milestone Estimate (one agent)
G1 Foundation: workspace, quality gate, command registry, guard, control channel closed 2026-10-14 M0 done (~2 h measured)
G2 Editor core: buffers, undo, multi-caret, save, recovery journal M1 ~30 h
G3 Project model: VFS (M1.2: listing, ignore rules, native file watching with polling fallback, safe file IO), project tree, tabs; command palette, settings, theme switching M1 ~27 h
G4 Syntax and structure: tree-sitter PHP, Lezer highlighting, file structure M2 ~15 h
G5 Search and navigation: find in files, go to file/class/symbol, first index M2 ~35 h
G6 Language server: completion, diagnostics, definition, hover, rename via Phpactor M3 ~45 h
G7 Terminal, lutra CLI and MCP server M3 ~35 h
G8 Git integration M4 ~150 h
G9 Debugger, test runner, Composer, run configurations M5 ~300 h
G10 Own indexer, type inference, inspections, refactorings M6 ~800 h
G11 Stability: crash-free operation on real projects and machines ongoing ~100 h
G12 Performance budgets: start, open, type, search, index ongoing ~100 h
G13 Frameworks: Symfony, Laravel, Shopware, WordPress M6 ~300 h
G14 Localization: English and German interface later ~40 h
G15 Database tools, HTTP client, Docker and remote later ~430 h
G16 Plug-ins and ecosystem later ~120 h

Known smaller items from M0:

  • The CI workflow has never run: the repository has no remote until the owner decides on hosting.
  • ui.screenshot captures the screen region of the window, so covering windows appear in the image; a webview-native capture would avoid that.
  • cargo xtask fixtures needs Composer, which the M0 machine does not have.

Revision history

Date Change Summary
2026-10-14 minor G3: native file watching (M1.2b); notify item resolved (CC0-1.0 approved for notify)
2026-10-14 minor G3 shrunk by the VFS (M1.2); notify licence item
2026-10-14 minor G1 closed; estimates for G2–G16; M0 follow-ups
2026-10-13 major Initial gap list