1.4 KiB
1.4 KiB
Milestones
Status: current focus M0 · Last updated: 2026-10-13
| Milestone | Goal | State |
|---|---|---|
| M0 | Foundation: workspace, lints, quality gate, command registry, control channel, empty window | not started |
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | not started |
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | not started |
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; lutra CLI — MVP |
not started |
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | not started |
| M5 | Debugger (Xdebug via DAP), PHPUnit/Pest runner, Composer, run configurations | not started |
| M6 | Own indexer and inspections; Symfony, Laravel, Shopware, WordPress support | not started |
Alpha gate
Alpha is reached when these six core workflows work end to end on macOS, Windows and Linux, with save and reopen:
- Open a project, browse and edit files, save, recover after a crash.
- Navigate: go to file, class, symbol and definition; find in files.
- Write code with completion and diagnostics.
- Run commands in the integrated terminal.
- Commit, diff and switch branches with Git.
- Drive all of the above from the CLI, the control channel and MCP.
Revision history
| Date | Change | Summary |
|---|---|---|
| 2026-10-13 | major | Initial milestones |