- The parent directory of every open buffer is pinned in the project
watcher (workspace::sync_buffer_dirs after every command): it counts
against the cap but is never evicted while a buffer in it is open, so
reloads and fileChangedOnDisk arrive for never-expanded folders.
- file.open on an already-open buffer emits the new bufferFocused {id};
the editor activates that tab and it outranks pending adoptions.
- The project tree shows a "Listing truncated" note row
(project.tree.truncated) after a partly listed directory.
- Tests: engine (pinning, eviction, focus), control channel
(bufferFocused), Vitest (tab switch, race, truncated row).
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
43 lines
2.7 KiB
Markdown
43 lines
2.7 KiB
Markdown
# Milestones
|
||
|
||
> **Status:** M0 done, M1 in progress · **Last updated:** 2026-10-16
|
||
|
||
Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, the rest estimated. Since cycle C1 (factor 0.07) M1–M3 are scaled ×0.1; M4–M6 keep their first raw estimates (multiply by ~0.1 for the calibrated value).
|
||
|
||
| Milestone | Goal | State | Hours |
|
||
|---|---|---|---:|
|
||
| M0 | Foundation: workspace, lints, quality gate, command registry, control channel, empty window | done 2026-10-14 (CI workflow written, not yet run: hosted on Forgejo, runners unknown) | ~2 (measured) |
|
||
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | in progress (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.13 C1 follow-ups) | ~6 (2.5 measured for M1.1–M1.6) |
|
||
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | not started | ~5 |
|
||
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | not started | ~8 |
|
||
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | not started | ~150 |
|
||
| M5 | Debugger (Xdebug via DAP), PHPUnit/Pest runner, Composer, run configurations | not started | ~300 |
|
||
| M6 | Own indexer and inspections; Symfony, Laravel, Shopware, WordPress support | not started | ~1,100 |
|
||
|
||
## Alpha gate
|
||
|
||
Alpha is reached when these six core workflows work end to end on macOS, Windows and Linux, with save and reopen:
|
||
|
||
1. Open a project, browse and edit files, save, recover after a crash.
|
||
2. Navigate: go to file, class, symbol and definition; find in files.
|
||
3. Write code with completion and diagnostics.
|
||
4. Run commands in the integrated terminal.
|
||
5. Commit, diff and switch branches with Git.
|
||
6. Drive all of the above from the CLI, the control channel and MCP.
|
||
|
||
By the raw estimates the alpha gate needs M1–M4 plus cross-platform verification, about 350 h; calibrated with cycle C1's factor, about 35 h of agent time. Calendar time is dominated by reviews and owner decisions, not agent time.
|
||
|
||
## Revision history
|
||
|
||
| Date | Change | Summary |
|
||
|---|---|---|
|
||
| 2026-10-16 | minor | M1.13 C1 follow-ups |
|
||
| 2026-10-16 | minor | M1.7 recovery journal |
|
||
| 2026-10-16 | minor | M1.9a settings backend, M1.10 themes |
|
||
| 2026-10-15 | minor | M1.11 message catalog |
|
||
| 2026-10-15 | minor | Cycle C1 review: M1–M3 hours recalibrated ×0.1, M0 CI note |
|
||
| 2026-10-15 | minor | M1.6 tabs and editor |
|
||
| 2026-10-15 | minor | M1.4 desktop bridge |
|
||
| 2026-10-14 | minor | M1 in progress |
|
||
| 2026-10-14 | minor | M0 done; hours per milestone |
|
||
| 2026-10-13 | major | Initial milestones |
|