- crates/control: rendezvous file (<data_dir>/instance.json, port + random token, atomic write, 0600 on Unix, stale detection), token-protected listener (start_with_token, app.auth first, constant-time compare, 10 s auth timeout), app.focus, and a blocking client (connect_live, request/execute/subscribe/next_event, open_folder/open_file/reveal) - lutra-desktop: a normal start forwards its path to a running instance and exits, otherwise claims the rendezvous; --control instances skip it unless LUTRA_RENDEZVOUS_DIR is set; non-Unicode args are usage errors - lutra-cli (binary lutra, now L6): path[:line[:column]] targets, folder -> project.open, file -> file.open (parent opened without a project, outside the project refused), editor.reveal, starts the desktop if needed, --wait until bufferClosed, --version/--help, exit codes 0/1/2 - tests: proptest target parsing, rendezvous read/write/stale, token check over TCP, forwarding against a test backend, --wait end to end - docs: architecture, G7, ROADMAP (agent automation 18% est.), roadmap, README Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
3.7 KiB
3.7 KiB
Milestones
Status: M0 done, M1 done, M2 in progress · Last updated: 2026-10-17
Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, the rest estimated. Since cycle C1 (factor 0.07) M1–M3 are scaled ×0.1; M4–M6 keep their first raw estimates (multiply by ~0.1 for the calibrated value).
| Milestone | Goal | State | Hours |
|---|---|---|---|
| M0 | Foundation: workspace, lints, quality gate, command registry, control channel, empty window | done 2026-10-14 (CI workflow written, not yet run: hosted on Forgejo, runners unknown) | ~2 (measured) |
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | done 2026-10-16 (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.12 notifications, M1.13 C1 follow-ups, M1.8 command palette and keymap, M1.14 app icon, M1.9b settings dialog; C2 live checks pending, gaming mode) | ~5.6 (measured: C1 2.5, C2 3.1) |
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | done 2026-10-17 (C3: M2.1 tree-sitter syntax, M2.2 highlighting + editor.reveal, M2.3 search backend, M2.4 Find tool window, M2.5 symbol index + go-to commands, M2.6 go-to popup, M2.7 Structure tool window) |
~6.1 (measured) |
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; lutra CLI and MCP — MVP |
in progress (M3.7 CLI and single instance done) | ~12 |
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | not started | ~150 |
| M5 | Debugger (Xdebug via DAP), PHPUnit/Pest runner, Composer, run configurations | not started | ~300 |
| M6 | Own indexer and inspections; Symfony, Laravel, Shopware, WordPress support | not started | ~1,100 |
Alpha gate
Alpha is reached when these six core workflows work end to end on macOS, Windows and Linux, with save and reopen:
- Open a project, browse and edit files, save, recover after a crash.
- Navigate: go to file, class, symbol and definition; find in files.
- Write code with completion and diagnostics.
- Run commands in the integrated terminal.
- Commit, diff and switch branches with Git.
- Drive all of the above from the CLI, the control channel and MCP.
By the raw estimates the alpha gate needs M1–M4 plus cross-platform verification, about 350 h; calibrated with cycle C1's factor, about 35 h of agent time. Calendar time is dominated by reviews and owner decisions, not agent time.
Revision history
| Date | Change | Summary |
|---|---|---|
| 2026-10-17 | minor | M3.7 CLI and single instance |
| 2026-10-17 | minor | M2 done (C3 review), M3 ~12 h at ×0.15 |
| 2026-10-17 | minor | M2.6 go-to popup |
| 2026-10-17 | minor | M2.7 Structure tool window |
| 2026-10-17 | minor | M2.4 Find tool window |
| 2026-10-16 | minor | M2 in progress: M2.2 highlighting and editor.reveal |
| 2026-10-16 | minor | Cycle C2 review: M1 hours measured |
| 2026-10-16 | minor | M1.9b settings dialog; M1 done |
| 2026-10-16 | minor | M1.8 command palette, global keymap, UI commands |
| 2026-10-16 | minor | M1.12 notifications |
| 2026-10-16 | minor | M1.13 C1 follow-ups |
| 2026-10-16 | minor | M1.7 recovery journal |
| 2026-10-16 | minor | M1.9a settings backend, M1.10 themes |
| 2026-10-15 | minor | M1.11 message catalog |
| 2026-10-15 | minor | Cycle C1 review: M1–M3 hours recalibrated ×0.1, M0 CI note |
| 2026-10-15 | minor | M1.6 tabs and editor |
| 2026-10-15 | minor | M1.4 desktop bridge |
| 2026-10-14 | minor | M1 in progress |
| 2026-10-14 | minor | M0 done; hours per milestone |
| 2026-10-13 | major | Initial milestones |