Lutra/docs/roadmap.md
danny 9fa6028335 M1.6: tabs and CodeMirror editor
- Editor area with tab bar, CodeMirror 6 view, close question and notices
  (ui/src/components/editor/, ui/src/stores/editor.ts), mounted in App.vue;
  the project tree opens files through the editor store.
- BufferSync: local edits to buffer.edit against the confirmed version,
  one call in flight, resync on stale_version or newer bufferChanged with
  rebase of unsent changes; EngineText maps CodeMirror positions to engine
  UTF-16 offsets for CRLF text.
- Save, save all and close from engine default shortcuts via listCommands.
- Dirty marker, Save / Don't Save / Cancel, non-blocking notice when a
  dirty file changes or disappears on disk.
- Vitest: keystroke bursts with stale versions and remote edits (LF and
  CRLF), mapping, store and component tests against a fake engine.
- Progress docs: Editor core 8% (est.), depth ~1.4%, G2, ui-parity tabs,
  M1 row, architecture, README status.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-15 18:26:32 +02:00

2 KiB
Raw Blame History

Milestones

Status: M0 done, M1 in progress · Last updated: 2026-10-15

Hours are agent wall-clock hours for one agent; M0 is measured, the rest estimated.

Milestone Goal State Hours
M0 Foundation: workspace, lints, quality gate, command registry, control channel, empty window done 2026-10-14 (CI workflow written, not yet run: no remote) ~2 (measured)
M1 Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes in progress (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor) ~60
M2 Syntax and search: highlighting, structure, find in files, go to file/class/symbol not started ~50
M3 LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; lutra CLI and MCP — MVP not started ~80
M4 Git: status, diff, commit, branches, log, blame, conflicts not started ~150
M5 Debugger (Xdebug via DAP), PHPUnit/Pest runner, Composer, run configurations not started ~300
M6 Own indexer and inspections; Symfony, Laravel, Shopware, WordPress support not started ~1,100

Alpha gate

Alpha is reached when these six core workflows work end to end on macOS, Windows and Linux, with save and reopen:

  1. Open a project, browse and edit files, save, recover after a crash.
  2. Navigate: go to file, class, symbol and definition; find in files.
  3. Write code with completion and diagnostics.
  4. Run commands in the integrated terminal.
  5. Commit, diff and switch branches with Git.
  6. Drive all of the above from the CLI, the control channel and MCP.

By the estimates above the alpha gate needs M1–M4 plus cross-platform verification, about 350 h.

Revision history

Date Change Summary
2026-10-15 minor M1.6 tabs and editor
2026-10-15 minor M1.4 desktop bridge
2026-10-14 minor M1 in progress
2026-10-14 minor M0 done; hours per milestone
2026-10-13 major Initial milestones