Lutra/docs/roadmap.md
danny cde6e119c6 M1.10: light theme, live theme switching, editor tokens
- theme::LIGHT next to DARK with the 10 new tokens (editor selection,
  active line, cursor, gutter, match, font size, tab active/modified,
  notice); light fg-muted, accent and error darkened for WCAG AA
- theme.list, theme.systemPreference, themeChanged event when the
  resolved theme changes (settings.set/reset appearance.theme, or the
  OS preference in system mode)
- desktop init script and window background from the stored setting;
  system mode uses a prefers-color-scheme media query for the first frame
- ui/src/theme.ts applies tokens to :root and color-scheme live; editor,
  tabs and notice drop their var() fallbacks
- Vitest WCAG AA contrast check against a Rust-maintained snapshot,
  DOM tests, headless control-channel test
- docs: architecture Themes, parity rows, ui-parity, gaps, roadmaps

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-16 15:49:23 +02:00

41 lines
2.6 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

# Milestones
> **Status:** M0 done, M1 in progress · **Last updated:** 2026-10-16
Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, the rest estimated. Since cycle C1 (factor 0.07) M1–M3 are scaled ×0.1; M4–M6 keep their first raw estimates (multiply by ~0.1 for the calibrated value).
| Milestone | Goal | State | Hours |
|---|---|---|---:|
| M0 | Foundation: workspace, lints, quality gate, command registry, control channel, empty window | done 2026-10-14 (CI workflow written, not yet run: hosted on Forgejo, runners unknown) | ~2 (measured) |
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | in progress (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes) | ~6 (2.5 measured for M1.1–M1.6) |
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | not started | ~5 |
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | not started | ~8 |
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | not started | ~150 |
| M5 | Debugger (Xdebug via DAP), PHPUnit/Pest runner, Composer, run configurations | not started | ~300 |
| M6 | Own indexer and inspections; Symfony, Laravel, Shopware, WordPress support | not started | ~1,100 |
## Alpha gate
Alpha is reached when these six core workflows work end to end on macOS, Windows and Linux, with save and reopen:
1. Open a project, browse and edit files, save, recover after a crash.
2. Navigate: go to file, class, symbol and definition; find in files.
3. Write code with completion and diagnostics.
4. Run commands in the integrated terminal.
5. Commit, diff and switch branches with Git.
6. Drive all of the above from the CLI, the control channel and MCP.
By the raw estimates the alpha gate needs M1–M4 plus cross-platform verification, about 350 h; calibrated with cycle C1's factor, about 35 h of agent time. Calendar time is dominated by reviews and owner decisions, not agent time.
## Revision history
| Date | Change | Summary |
|---|---|---|
| 2026-10-16 | minor | M1.9a settings backend, M1.10 themes |
| 2026-10-15 | minor | M1.11 message catalog |
| 2026-10-15 | minor | Cycle C1 review: M1–M3 hours recalibrated ×0.1, M0 CI note |
| 2026-10-15 | minor | M1.6 tabs and editor |
| 2026-10-15 | minor | M1.4 desktop bridge |
| 2026-10-14 | minor | M1 in progress |
| 2026-10-14 | minor | M0 done; hours per milestone |
| 2026-10-13 | major | Initial milestones |