Lutra/docs/roadmap.md
danny f41df518b5 M1.12: notifications as toasts
The host publishes picker, command-line and pump errors as notification
events (Engine::notify, same id sequence) instead of stderr, keeps
notifications and watchFailed published before engine_ready and replays
them after the state replay, so startup warnings (corrupt settings,
journal entries) reach the UI. ipc.ts announces engine_ready once all
subscriptions started together are registered.

Frontend: notifications store and NotificationStack (bottom right, info
auto-dismissed after 5 s, warnings/errors stay, close button and Escape,
at most 5 visible with "+n more", role status/alert); watchFailed maps to
a warning toast; failed commands without their own UI raise an error
toast. Catalog keys notification.settings.*, project.*, vfs.*, watch.*,
command.* plus the runtime allow-list. Docs updated.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-16 16:20:45 +02:00

2.7 KiB
Raw Blame History

Milestones

Status: M0 done, M1 in progress · Last updated: 2026-10-16

Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, the rest estimated. Since cycle C1 (factor 0.07) M1–M3 are scaled ×0.1; M4–M6 keep their first raw estimates (multiply by ~0.1 for the calibrated value).

Milestone Goal State Hours
M0 Foundation: workspace, lints, quality gate, command registry, control channel, empty window done 2026-10-14 (CI workflow written, not yet run: hosted on Forgejo, runners unknown) ~2 (measured)
M1 Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes in progress (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.12 notifications) ~6 (2.5 measured for M1.1–M1.6)
M2 Syntax and search: highlighting, structure, find in files, go to file/class/symbol not started ~5
M3 LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; lutra CLI and MCP — MVP not started ~8
M4 Git: status, diff, commit, branches, log, blame, conflicts not started ~150
M5 Debugger (Xdebug via DAP), PHPUnit/Pest runner, Composer, run configurations not started ~300
M6 Own indexer and inspections; Symfony, Laravel, Shopware, WordPress support not started ~1,100

Alpha gate

Alpha is reached when these six core workflows work end to end on macOS, Windows and Linux, with save and reopen:

  1. Open a project, browse and edit files, save, recover after a crash.
  2. Navigate: go to file, class, symbol and definition; find in files.
  3. Write code with completion and diagnostics.
  4. Run commands in the integrated terminal.
  5. Commit, diff and switch branches with Git.
  6. Drive all of the above from the CLI, the control channel and MCP.

By the raw estimates the alpha gate needs M1–M4 plus cross-platform verification, about 350 h; calibrated with cycle C1's factor, about 35 h of agent time. Calendar time is dominated by reviews and owner decisions, not agent time.

Revision history

Date Change Summary
2026-10-16 minor M1.12 notifications
2026-10-16 minor M1.7 recovery journal
2026-10-16 minor M1.9a settings backend, M1.10 themes
2026-10-15 minor M1.11 message catalog
2026-10-15 minor Cycle C1 review: M1–M3 hours recalibrated ×0.1, M0 CI note
2026-10-15 minor M1.6 tabs and editor
2026-10-15 minor M1.4 desktop bridge
2026-10-14 minor M1 in progress
2026-10-14 minor M0 done; hours per milestone
2026-10-13 major Initial milestones