MVP (M1-M3) about 190 agent hours, full parity about 3,300 hours (range 2,000-5,000), all marked estimated. M0 measured at about 2 hours of active agent time. Hours per area in target-app-parity, per gap in gaps.md and per milestone in roadmap.md; ROADMAP and README status updated. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
35 lines
1.8 KiB
Markdown
35 lines
1.8 KiB
Markdown
# Milestones
|
||
|
||
> **Status:** M0 done, current focus M1 · **Last updated:** 2026-10-14
|
||
|
||
Hours are agent wall-clock hours for one agent; M0 is measured, the rest estimated.
|
||
|
||
| Milestone | Goal | State | Hours |
|
||
|---|---|---|---:|
|
||
| M0 | Foundation: workspace, lints, quality gate, command registry, control channel, empty window | done 2026-10-14 (CI workflow written, not yet run: no remote) | ~2 (measured) |
|
||
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | not started | ~60 |
|
||
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | not started | ~50 |
|
||
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | not started | ~80 |
|
||
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | not started | ~150 |
|
||
| M5 | Debugger (Xdebug via DAP), PHPUnit/Pest runner, Composer, run configurations | not started | ~300 |
|
||
| M6 | Own indexer and inspections; Symfony, Laravel, Shopware, WordPress support | not started | ~1,100 |
|
||
|
||
## Alpha gate
|
||
|
||
Alpha is reached when these six core workflows work end to end on macOS, Windows and Linux, with save and reopen:
|
||
|
||
1. Open a project, browse and edit files, save, recover after a crash.
|
||
2. Navigate: go to file, class, symbol and definition; find in files.
|
||
3. Write code with completion and diagnostics.
|
||
4. Run commands in the integrated terminal.
|
||
5. Commit, diff and switch branches with Git.
|
||
6. Drive all of the above from the CLI, the control channel and MCP.
|
||
|
||
By the estimates above the alpha gate needs M1–M4 plus cross-platform verification, about 350 h.
|
||
|
||
## Revision history
|
||
|
||
| Date | Change | Summary |
|
||
|---|---|---|
|
||
| 2026-10-14 | minor | M0 done; hours per milestone |
|
||
| 2026-10-13 | major | Initial milestones |
|