Lutra/docs/roadmap.md
danny 943ff889df M2.6: go-to popup for files, classes and symbols
One popup with Files / Classes / Symbols tabs (Tab switches), opened by
goto.fileOpen (Mod+P), goto.classOpen (Mod+Alt+C) and goto.symbolOpen
(Mod+T), each with an optional {query} for agents. Live debounced query
against goto.* with stale answers dropped, matched characters marked,
directory / namespace / container column, library rows labelled, an
indexing hint with progress and a re-query on indexReady. Enter or a
click opens through editor.reveal; Escape closes. An exclusive modal and
a launcher: any other command closes it.

goto.file items now carry `library` (PM decision). indexProgress and
indexReady join the ipc event union. Notes in plan/phpstorm/08-goto.md.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 17:35:50 +02:00

3.5 KiB
Raw Blame History

Milestones

Status: M0 done, M1 done, M2 in progress · Last updated: 2026-10-17

Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, the rest estimated. Since cycle C1 (factor 0.07) M1–M3 are scaled ×0.1; M4–M6 keep their first raw estimates (multiply by ~0.1 for the calibrated value).

Milestone Goal State Hours
M0 Foundation: workspace, lints, quality gate, command registry, control channel, empty window done 2026-10-14 (CI workflow written, not yet run: hosted on Forgejo, runners unknown) ~2 (measured)
M1 Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes done 2026-10-16 (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.12 notifications, M1.13 C1 follow-ups, M1.8 command palette and keymap, M1.14 app icon, M1.9b settings dialog; C2 live checks pending, gaming mode) ~5.6 (measured: C1 2.5, C2 3.1)
M2 Syntax and search: highlighting, structure, find in files, go to file/class/symbol in progress (C3: M2.2 highlighting and editor.reveal, M2.3 search backend, M2.4 Find tool window, M2.5 symbol index, M2.6 go-to popup, M2.7 Structure tool window) ~5
M3 LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; lutra CLI and MCP — MVP not started ~8
M4 Git: status, diff, commit, branches, log, blame, conflicts not started ~150
M5 Debugger (Xdebug via DAP), PHPUnit/Pest runner, Composer, run configurations not started ~300
M6 Own indexer and inspections; Symfony, Laravel, Shopware, WordPress support not started ~1,100

Alpha gate

Alpha is reached when these six core workflows work end to end on macOS, Windows and Linux, with save and reopen:

  1. Open a project, browse and edit files, save, recover after a crash.
  2. Navigate: go to file, class, symbol and definition; find in files.
  3. Write code with completion and diagnostics.
  4. Run commands in the integrated terminal.
  5. Commit, diff and switch branches with Git.
  6. Drive all of the above from the CLI, the control channel and MCP.

By the raw estimates the alpha gate needs M1–M4 plus cross-platform verification, about 350 h; calibrated with cycle C1's factor, about 35 h of agent time. Calendar time is dominated by reviews and owner decisions, not agent time.

Revision history

Date Change Summary
2026-10-17 minor M2.6 go-to popup
2026-10-17 minor M2.7 Structure tool window
2026-10-17 minor M2.4 Find tool window
2026-10-16 minor M2 in progress: M2.2 highlighting and editor.reveal
2026-10-16 minor Cycle C2 review: M1 hours measured
2026-10-16 minor M1.9b settings dialog; M1 done
2026-10-16 minor M1.8 command palette, global keymap, UI commands
2026-10-16 minor M1.12 notifications
2026-10-16 minor M1.13 C1 follow-ups
2026-10-16 minor M1.7 recovery journal
2026-10-16 minor M1.9a settings backend, M1.10 themes
2026-10-15 minor M1.11 message catalog
2026-10-15 minor Cycle C1 review: M1–M3 hours recalibrated ×0.1, M0 CI note
2026-10-15 minor M1.6 tabs and editor
2026-10-15 minor M1.4 desktop bridge
2026-10-14 minor M1 in progress
2026-10-14 minor M0 done; hours per milestone
2026-10-13 major Initial milestones