One popup with Files / Classes / Symbols tabs (Tab switches), opened by
goto.fileOpen (Mod+P), goto.classOpen (Mod+Alt+C) and goto.symbolOpen
(Mod+T), each with an optional {query} for agents. Live debounced query
against goto.* with stale answers dropped, matched characters marked,
directory / namespace / container column, library rows labelled, an
indexing hint with progress and a re-query on indexReady. Enter or a
click opens through editor.reveal; Escape closes. An exclusive modal and
a launcher: any other command closes it.
goto.file items now carry `library` (PM decision). indexProgress and
indexReady join the ipc event union. Notes in plan/phpstorm/08-goto.md.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
51 lines
3.5 KiB
Markdown
51 lines
3.5 KiB
Markdown
# Milestones
|
||
|
||
> **Status:** M0 done, M1 done, M2 in progress · **Last updated:** 2026-10-17
|
||
|
||
Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, the rest estimated. Since cycle C1 (factor 0.07) M1–M3 are scaled ×0.1; M4–M6 keep their first raw estimates (multiply by ~0.1 for the calibrated value).
|
||
|
||
| Milestone | Goal | State | Hours |
|
||
|---|---|---|---:|
|
||
| M0 | Foundation: workspace, lints, quality gate, command registry, control channel, empty window | done 2026-10-14 (CI workflow written, not yet run: hosted on Forgejo, runners unknown) | ~2 (measured) |
|
||
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | done 2026-10-16 (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.12 notifications, M1.13 C1 follow-ups, M1.8 command palette and keymap, M1.14 app icon, M1.9b settings dialog; C2 live checks pending, gaming mode) | ~5.6 (measured: C1 2.5, C2 3.1) |
|
||
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | in progress (C3: M2.2 highlighting and `editor.reveal`, M2.3 search backend, M2.4 Find tool window, M2.5 symbol index, M2.6 go-to popup, M2.7 Structure tool window) | ~5 |
|
||
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | not started | ~8 |
|
||
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | not started | ~150 |
|
||
| M5 | Debugger (Xdebug via DAP), PHPUnit/Pest runner, Composer, run configurations | not started | ~300 |
|
||
| M6 | Own indexer and inspections; Symfony, Laravel, Shopware, WordPress support | not started | ~1,100 |
|
||
|
||
## Alpha gate
|
||
|
||
Alpha is reached when these six core workflows work end to end on macOS, Windows and Linux, with save and reopen:
|
||
|
||
1. Open a project, browse and edit files, save, recover after a crash.
|
||
2. Navigate: go to file, class, symbol and definition; find in files.
|
||
3. Write code with completion and diagnostics.
|
||
4. Run commands in the integrated terminal.
|
||
5. Commit, diff and switch branches with Git.
|
||
6. Drive all of the above from the CLI, the control channel and MCP.
|
||
|
||
By the raw estimates the alpha gate needs M1–M4 plus cross-platform verification, about 350 h; calibrated with cycle C1's factor, about 35 h of agent time. Calendar time is dominated by reviews and owner decisions, not agent time.
|
||
|
||
## Revision history
|
||
|
||
| Date | Change | Summary |
|
||
|---|---|---|
|
||
| 2026-10-17 | minor | M2.6 go-to popup |
|
||
| 2026-10-17 | minor | M2.7 Structure tool window |
|
||
| 2026-10-17 | minor | M2.4 Find tool window |
|
||
| 2026-10-16 | minor | M2 in progress: M2.2 highlighting and `editor.reveal` |
|
||
| 2026-10-16 | minor | Cycle C2 review: M1 hours measured |
|
||
| 2026-10-16 | minor | M1.9b settings dialog; M1 done |
|
||
| 2026-10-16 | minor | M1.8 command palette, global keymap, UI commands |
|
||
| 2026-10-16 | minor | M1.12 notifications |
|
||
| 2026-10-16 | minor | M1.13 C1 follow-ups |
|
||
| 2026-10-16 | minor | M1.7 recovery journal |
|
||
| 2026-10-16 | minor | M1.9a settings backend, M1.10 themes |
|
||
| 2026-10-15 | minor | M1.11 message catalog |
|
||
| 2026-10-15 | minor | Cycle C1 review: M1–M3 hours recalibrated ×0.1, M0 CI note |
|
||
| 2026-10-15 | minor | M1.6 tabs and editor |
|
||
| 2026-10-15 | minor | M1.4 desktop bridge |
|
||
| 2026-10-14 | minor | M1 in progress |
|
||
| 2026-10-14 | minor | M0 done; hours per milestone |
|
||
| 2026-10-13 | major | Initial milestones |
|