Lutra/docs/roadmap.md
danny 943ff889df M2.6: go-to popup for files, classes and symbols
One popup with Files / Classes / Symbols tabs (Tab switches), opened by
goto.fileOpen (Mod+P), goto.classOpen (Mod+Alt+C) and goto.symbolOpen
(Mod+T), each with an optional {query} for agents. Live debounced query
against goto.* with stale answers dropped, matched characters marked,
directory / namespace / container column, library rows labelled, an
indexing hint with progress and a re-query on indexReady. Enter or a
click opens through editor.reveal; Escape closes. An exclusive modal and
a launcher: any other command closes it.

goto.file items now carry `library` (PM decision). indexProgress and
indexReady join the ipc event union. Notes in plan/phpstorm/08-goto.md.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-17 17:35:50 +02:00

51 lines
3.5 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

# Milestones
> **Status:** M0 done, M1 done, M2 in progress · **Last updated:** 2026-10-17
Hours are agent wall-clock hours for one agent; M0 and M1 so far are measured, the rest estimated. Since cycle C1 (factor 0.07) M1–M3 are scaled ×0.1; M4–M6 keep their first raw estimates (multiply by ~0.1 for the calibrated value).
| Milestone | Goal | State | Hours |
|---|---|---|---:|
| M0 | Foundation: workspace, lints, quality gate, command registry, control channel, empty window | done 2026-10-14 (CI workflow written, not yet run: hosted on Forgejo, runners unknown) | ~2 (measured) |
| M1 | Editor and project: open folder, tree, tabs, editor, save, recovery, palette, settings, themes | done 2026-10-16 (M1.1 text, M1.2 VFS, M1.5 tree UI, M1.3 engine workspace, M1.4 desktop bridge, M1.6 tabs and editor, M1.11 message catalog, M1.9a settings backend, M1.10 themes, M1.7 recovery journal, M1.12 notifications, M1.13 C1 follow-ups, M1.8 command palette and keymap, M1.14 app icon, M1.9b settings dialog; C2 live checks pending, gaming mode) | ~5.6 (measured: C1 2.5, C2 3.1) |
| M2 | Syntax and search: highlighting, structure, find in files, go to file/class/symbol | in progress (C3: M2.2 highlighting and `editor.reveal`, M2.3 search backend, M2.4 Find tool window, M2.5 symbol index, M2.6 go-to popup, M2.7 Structure tool window) | ~5 |
| M3 | LSP, terminal, CLI: completion, diagnostics, go to definition, hover, rename; terminal; `lutra` CLI and MCP — **MVP** | not started | ~8 |
| M4 | Git: status, diff, commit, branches, log, blame, conflicts | not started | ~150 |
| M5 | Debugger (Xdebug via DAP), PHPUnit/Pest runner, Composer, run configurations | not started | ~300 |
| M6 | Own indexer and inspections; Symfony, Laravel, Shopware, WordPress support | not started | ~1,100 |
## Alpha gate
Alpha is reached when these six core workflows work end to end on macOS, Windows and Linux, with save and reopen:
1. Open a project, browse and edit files, save, recover after a crash.
2. Navigate: go to file, class, symbol and definition; find in files.
3. Write code with completion and diagnostics.
4. Run commands in the integrated terminal.
5. Commit, diff and switch branches with Git.
6. Drive all of the above from the CLI, the control channel and MCP.
By the raw estimates the alpha gate needs M1–M4 plus cross-platform verification, about 350 h; calibrated with cycle C1's factor, about 35 h of agent time. Calendar time is dominated by reviews and owner decisions, not agent time.
## Revision history
| Date | Change | Summary |
|---|---|---|
| 2026-10-17 | minor | M2.6 go-to popup |
| 2026-10-17 | minor | M2.7 Structure tool window |
| 2026-10-17 | minor | M2.4 Find tool window |
| 2026-10-16 | minor | M2 in progress: M2.2 highlighting and `editor.reveal` |
| 2026-10-16 | minor | Cycle C2 review: M1 hours measured |
| 2026-10-16 | minor | M1.9b settings dialog; M1 done |
| 2026-10-16 | minor | M1.8 command palette, global keymap, UI commands |
| 2026-10-16 | minor | M1.12 notifications |
| 2026-10-16 | minor | M1.13 C1 follow-ups |
| 2026-10-16 | minor | M1.7 recovery journal |
| 2026-10-16 | minor | M1.9a settings backend, M1.10 themes |
| 2026-10-15 | minor | M1.11 message catalog |
| 2026-10-15 | minor | Cycle C1 review: M1–M3 hours recalibrated ×0.1, M0 CI note |
| 2026-10-15 | minor | M1.6 tabs and editor |
| 2026-10-15 | minor | M1.4 desktop bridge |
| 2026-10-14 | minor | M1 in progress |
| 2026-10-14 | minor | M0 done; hours per milestone |
| 2026-10-13 | major | Initial milestones |